SEGRO Logistics Centre Hamburg Neu Wulmstorf, Justus-von-Liebig-Str. 2, 21629 Neu Wulmstorf, Germany
- Available Immediately
- Size: 107532-233943 sq ft (9990-21734 sq m)
- Estate: SEGRO Logistics Centre Hamburg Neu Wulmstorf
Overview
The state-of-the-art SEGRO Logistics Centre Hamburg Neu Wulmstorf is located in the northern part of the Harburg district in the municipality of Neu Wulmstorf. Adjacent to the Free Hanseatic City of Hamburg, the Lower Saxony municipality of Neu Wulmstorf is part of the Hamburg Metropolitan Region.
With the Rade interchange, the municipality has direct access to the A1 motorway (E 22). The A7 motorway is just 9 km away from the town center and can be easily reached via the B73. Additionally, a separate motorway access for Neu Wulmstorf is planned for 2025, which will be only 5 minutes away by car. Approximately 15 km from the municipal border is the Port of Hamburg, which is the largest seaport in Germany and the third-largest in Europe. The Hamburg Airport is also reachable within a few minutes by car.
With its central location, excellent infrastructure, the Port of Hamburg, and Hamburg Airport, the location offers optimal conditions for your company.
Accommodation
Expected availability as of Q1 2025
Unit | Warehouse (sq.m) | Office (sq.m) | Mezzanine (sq.m) | Total (sq.m) |
1 | 9,231 | 150 | 609 | 9,990 |
2 | 10,383 | 150 | 1,211 | 11,744 |
Location
The SEGRO Logistics Centre Hamburg Neu Wulmstorf is located directly on the outskirts of Hamburg offering excellent infrastructure. With the planned connection to the A26 in 2025, the site will be excellently connected to Germany's most important logistics hub.
DISTANCES
- B73 = 1.3 km
- A26 = 4.2 km (motorway access planned for 2025)
- A1 = 11 km
- Port of Hamburg = 15 km
- Hamburg Central Station = 30 km
- Hamburg Airport = 39.7 km
PUBLIC TRANSPORTATION
- Bus stop “Lessingstraße” = 140m
- Train station “Neu Wulmstorf” = 1.7 km
Specifications
Warehouse
- Warehouse height: 12 m clear height (UKB)
- Warehouse floor:
- Steel fibre concrete slab
- 50 kN / sq m (5 t) permissible total weight and 75 kN point loads from rack posts - Doors:
- Each unit of the building has 1 sectional door (3 m W x 4.2 m H) for ground level access as well as
- 1 loading ramp with loading gates (3 m x 3 m) and electro-hydraulic dock leveller for each 1,000 sq m
of warehouse area - Windows: Aluminium windows with insulating glazing
- Lighting: Intelligent LED lighting systems
- Supply:
- Electricity and water supply per rental unit
- Electricity fuse protection per rental unit 63 A
- Warehouse heating via VRF systems
- Office heating via heat pump system
Office
- 1 ground floor office per rental unit (approx. 150 sq m incl. sanitary facilities and driver registration)
- Mezzanine office at tenant‘s request
Sustainable Aspects
- Green electricity supply through photovoltaic system
- Charging stations for electric cars (20 % of all car parking spaces)
- Air source heat pump
- DGNB Platinum and DGNB Climate Positive targeted